Project Summary
Daracon Group was engaged by Brown Commercial Building to complete two commercial driveways and storm water modifications as part of a new service station project for Pearl Energy at Hexham, NSW. The project required detailed excavation works, subgrade compaction works, and formwork.
As part of the integrated excavation and formwork program, Daracrete supplied concrete for two new commercial driveways, as well as the pours associated with alterations to existing stormwater pits and pipework.
Key Services Provided
- Concrete supply using a total of 60m3 B80 40 MPa concrete, delivering a high strength mix suitable for commercial requirements.
- Two initial concrete strip pours to enable formwork.
- Two main driveway pours, including the northern driveway and southern driveway.
- Various additional pours to facilitate storm water pipe and pipe modifications.